Future Generator
After installing the gas collection system, we have observed that there
is enough gas coming from the landfill to power at least one more
engine. We hope to get it installed in late 2007, early
2008. All the infrastructure at SECCRA Power has been designed to
accommodate two generators, so it will be a simple installation
of the second unit.
|