Future Generator

After installing the gas collection system, we have observed that there is enough gas coming from the landfill to power at least one more engine.  We hope to get it installed in late 2007, early 2008.  All the infrastructure at SECCRA Power has been designed to accommodate two generators, so it will be a simple installation of  the second unit.
 
 

Home | Waste Disposal | Recycling | About Us | Staff Access
Keeping Our Community Clean
All Content Copyright SECCRA and its licensors. All Rights Reserved.